Hi,
I have an issue that initially appeared as simple... but it turned out not to be. Let me define the problem:
Material: MRP type V1, checking rule CH, no strategy group, standard sales order (OR), standard item position (TAN), client allowing multiple del.
ATP check settings: include PO, check without RLT, checking rule E, availability check with cumulative confirmed quantities at creation & modification.
The stock & req. situation:
stock of 50 as today
PO of 100 pc. in ten days
If a create a sales order today for 100 pc., it should confirm the 50 available pieces and make a delivery proposal for the rest of 50 in 10 days; that means, I would like to see two schedule lines, one for tomorrow, with 50 confirmed pieces and one of 50 in ten days, without confirmation.
What actually happens is that I can confirm the 50 for tomorrow and that is all... no delivery proposal!
What am I missing?
Thank you,
H.