Hi SAP Experts
I read a material ledger book, in the multilevel price determination section, it read " The divergent cycle can happen when we have negative consumption."
What is the divergent cycle ? why negative consumption lead to divergent cycle ? If possible, please give me a specific example.
thanks a lot.
Regards
Louis