Recently, a new machine is added to the plant.
This new machine and the current existing old machine will be used.
The machines are used to process the HALB into FERT with the addition of a packaging material.
However, the new machine uses a different size of the same packaging material used in the old machine.
That means, the BOM and Routing of using both the new and old machine are the same but only the size of the packaging material is different.
How can this be captured in the system?
Do we need to create a new material number for the packaging material used by the new machine because of it's different size and use it to create a new BOM?