Hello!
I have strategy "3-Previous standard cost estimate" in transfer control material cost estimate.
I have cost estimate for product AAA with status KA and costing date from 01.01.2014.
Product AAA produced from component BBB.
Component BBB has two cost estimates with costing date from 01.01.2014 and 01.02.2014.
I run cost estimate for product AAA with costing date from 06.03.2014.
Cost estimate not use existing cost estimate for component and create new cost estimate.
In help.sap.com contains next information about transfer strategy 3 - The system searches for existing previous cost estimate.
why my system does not use the existing cost estimate for component?